48hr
Survey to Quote
100%
DBS-Safe Delivery
BS EN 13782
Structural Cert.
Term- Aware
Installation Planning
Education Marquee Specialists
Space When
You Need It.
Safe When
It Matters.
Schools and colleges face unique space pressures: refurbishment programmes that displace core facilities, enrolment growth outpacing existing capacity, and annual events that demand professional environments. Hiring a draughty local hall isn't the answer when a purpose-built Marquee on your own campus delivers a better experience for students, staff, and families.
M S Marquees works exclusively with DBS-cleared site teams on education campuses. Every installation is planned around your safeguarding protocols, term schedule, and physical constraints, from access routes to overhead cables, underground services to soft landscaping. We have deployed on primary schools, independent colleges, Russell Group universities, and everything in between.
What We Offer
Six Solutions
For Education
Spaces
01
Temporary Examination Halls
When your existing hall can't accommodate a growing cohort, or refurbishment takes it offline, we deploy clearspan examination Marquees engineered for silence, controlled temperature, and structured circulation. Desk spacing, access routes, and invigilation sightlines all planned in advance. Fully compliant with JCQ requirements for exam environments.
02
Temporary Classroom & Teaching Space
Whether your school is mid-refurbishment, managing a surge in enrolment, or running specialist programmes that need dedicated space, our teaching Marquees deliver insulated, heated, naturally lit environments that support real learning. Power, broadband-ready conduit, and hardwood flooring included as standard.
03
Graduation & Award Ceremonies
Your ceremony deserves more than a hired-out civic hall. A bespoke Marquee on campus keeps the day personal, avoids transport logistics for families, and gives you full creative control over the environment, from stage placement and lighting to seating configurations that reflect your school's character.
04
Open Day & Prospectus Events
First impressions shape enrolment. Our open day structures create impressive welcome pavilions, subject showcase areas, and outdoor flow zones that transform the campus into a venue families remember. Branded interiors, departmental zones, and catering infrastructure all coordinated.
05
Sports Day & PE Weather Cover
Unpredictable British weather shouldn't derail your annual calendar. Our sports day Marquees create covered seating for parents, shade structures for athletes, and weather-protected award areas that let the day proceed regardless of conditions.
06
Dining Overflow & Canteen Extension
When lunchtime footfall exceeds canteen capacity, or building works displace your existing dining space, a temporary dining Marquee keeps the day running. Ground-level flooring, kitchen connection points, and acoustic management all specified during the site survey.
Structure Visualisation
See It Before
We Build It
Every education Marquee project includes a full 3D CAD layout before a single peg is driven. You see the exact footprint on your campus map, the interior configuration, desk spacing for exams, seating rows for ceremonies, and circulation routes.
Nothing goes to build without your sign-off. Governors, site managers, and safeguarding leads can review the plan and request amendments before installation begins.
Request A CAD LayoutOur Education Process
Planned Around
The School Day
01
Campus Consultation
We meet your site manager, business manager, or bursar, whoever owns the space decision, and understand exactly what's needed, when it's needed, and what constraints the campus presents.
02
Safeguarding Survey
Our DBS-cleared surveyor walks the proposed site with your safeguarding lead, identifying access routes, proximity to teaching areas, emergency exits, and required exclusion zones during build.
03
CAD Design
Full 3D layout produced showing structure footprint, interior configuration, circulation routes, and connection to existing campus infrastructure. Shared with governors and site team for sign-off.
04
Term-Aware Build
Installation scheduled for holidays, weekends, or agreed out-of-hours periods. Build team operates under campus safeguarding protocol throughout. Site restored daily if adjacent to teaching areas.
05
Interior Fit-Out
Flooring, heating, lighting, power distribution, furniture, and any specialist fit-out (desk configuration, staging, acoustic lining) completed and signed off before handover.
06
Handover & Support
Your dedicated contact remains available throughout the hire period. Post-event derig is planned to the same standard, campus restored, access reinstated, no lasting impact on the site.
Why Schools Choose Us
The M S Marquees
Education Standard
Campus Safety First
DBS-cleared teams, agreed access routes, safeguarding-compliant installation planning as standard on every school and college project.
Academic Calendar Aware
We build around term dates, exam schedules, and school day hours. No disruption to teaching without advance agreement.
Structural Certification
Full BS EN 13782 engineering certification provided with every build. Documentation available for governors, insurers, and local authority.
Controlled Environments
Industrial heating, acoustic lining, natural light panels, and climate management mean students work in comfort regardless of season.
One Point of Contact
Your dedicated project manager handles survey, build, interior fit-out, and derig. Nothing falls through the gap between teams.
Rapid Deployment
When the situation is urgent, refurbishment overruns, emergency capacity, we move fast without compromising quality or compliance.
What Schools Say
From The
Clients
“
We were mid-refurbishment in September and needed an exam hall by November. M S Marquees surveyed the site, produced CAD plans, and delivered a compliant, climate-controlled structure that our 180 students used without issue. The installation team worked around our school day perfectly.
Head of Operations
Independent Secondary School, Surrey
“
Our graduation was always held off-site, which families found stressful. This year we held it in a Marquee on the front grounds. Parents were emotional about seeing their children graduate in a proper ceremony on campus, it was exactly what we'd hoped for.
Principal
Sixth Form College, West Midlands
“
The open day Marquee transformed our visitor numbers. Prospective families commented on how professional and welcoming the campus felt. Our applications increased 22% that year. Genuinely cannot attribute it to one thing, but the environment we created helped.
Director of Admissions
Grammar School, Kent
Ready To Discuss
Your Campus?
Tell us the type of space you need, your term calendar, and your site constraints. We respond within 48 hours with an honest assessment and outline cost, no obligation.
Common Questions
Education
FAQ
Questions we get from school business managers, bursars, and site teams every day.
Ask A Question →

